Hey guys!
This week we've been working on putting the finishing touches on the 3D model, such as adding the beehive structure and pipe to the stormwater bumpout, taking pictures of the structure to be used in the engineering drawings, finishing the drainage area map in AutoCAD, and adding appropriate plants in all of the GSIs. Next week, we hope to work more on the final draft, to finish the drainage area map, to create the presentation, and to finish the calculations. Thanks for following our development, and below are some pictures of our progress!