Q: What is a stormwater Greenstreet, and how does it work?

A: Green street infrastructures are implemented into sidewalks to work towards the goal of preventing damage to the sidewalk itself and also the area nearby.

Q: What is a Rain Garden, and how does it work?

A: "A rain garden is a shallow depressed area in the ground that absorbs rain from streets, allowing rain to soak directly into the soil." Made up of shrubs and perennials native to the area, rain gardens are an effective GSI in reduce the amount of runoff from potentially flooding local streets.

Q: What is a Right-of-Way Bioswale, and how does it work?

A: Right-of-way bioswales are green infrastructures designed to capture stormwater runoff and alleviate the water, therefore reducing the number of water that enters the sewer system, and reducing the chance of sewer flooding. Bioswales are typically vegetated or mulched and treat water as it flows into the system, while also reducing the amount of water that does enter the system.

Q: What is a Stormwater Bumpout, and how does it work?

A: "A stormwater bumpout is a vegetated curb extension that protrudes into the street either mid-block or at an intersection, creating a new curb some distance from the existing curb. A bumpout is composed of a layer of stone that is topped with soil and plants. An inlet or curb-cut directs runoff into the bumpout structure where it can be stored, infiltrated, and taken up by the plants (evapotranspiration). Excess runoff is permitted to leave the system and flow to an existing inlet. The vegetation of the bumpout will be short enough to allow for open sight lines of traffic. Aside from managing stormwater, bumpouts also help with traffic-calming, and when located at crosswalks, they provide a pedestrian safety benefit by reducing the street crossing distance."

Q: What programs will you be using to complete this project?

The programs we will be using to complete this project are Sketchup for 3D modeling, and AutoCad for the drainage area map.

Q: Why do this project?

A: Flooding is a problem that plagues many areas throughout the world. As we have seen firsthand how dangerous it can be, we want to propose a solution to the flooding that is not only environmentally safe, but also aesthetically pleasing in the area.

Q: Is there anywhere you go more in-depth about the GSIs you are using?

A: There sure is! We posted about each of the GSIs in the own pages under the Background Material tab.

Comments

Popular posts from this blog

What We've Been Doing From Lab 4 to Lab 5

This week, we decided to focus on familiarizing ourselves with SketchUp, Philadelphia's Native Plants, and the area we are renovating. In Sketchup, we created the building, which is the basis of our area. That was difficult because we had to place each window on individually, but it helped us to gain a better understanding of how to use Sketchup, which we then used to created the right-of-way bioswale and sidewalks. Ina created a thread detailing the drainage in our area, and Carolina posted about the deterioration of the drain in the area we are in. Unfortunately, we didn't correctly draw the bioswale, so we will be re-doing it, but now we know how to create GSI's in SketchUp. Below are some pictures of our progress!

What We've Been Doing From Lab 6 to Lab 7

Hey guys! This week, we've been hard at work on the final report draft, so we have not had much time to work on the design. However, we were able to create a piping system extending into the sewer grate, and we taught ourselves how to create curved pipes in SketchUp. Along with our progress, we conducted more research on native Philadelphian plants, and implemented some of the ones we could find as 3-D models in the design. This week, we also started to conduct runoff calculations for our problem area. Next week, we will focus exclusively on creating the drainage area map, as well as doing calculations for the drainage, and we will complete the addition of the native plants into the design. Below are some pictures of our progress!

Deterioration of 32nd and Arch (UPDATE)

I decided to take a look at our site one rainy morning and I was shocked to see that the inlet was completely destroyed due to the severe flooding. It doesn't seem like anything is being done to resolve this problem and the area is progressively getting more dangerous.